top of page

Project References

Learn today how we can deliver infrastructure solutions to meet all of your challenges and needs. 

joao-alves-vPYypV0kprA-unsplash.jpg

distribution line

pls-cadd™

hardening and

reliability

We are currently working with a California utility on their Fire Risk Mitigation project. The Fire Risk Mitigation project is a hardening project that includes overhead 12kV distribution engineering and PLS-CADD™ design. 

mh-alavian-BEE_1XU7Ah4-unsplash (edit)_e

Distribution

engineering

and project scoping

We are currently working with a California utility on scoping conductors for replacement in high fire areas that are vulnerable to fault current damage.

download2.png

overhead transmission line

fire hardening

program

We are currently working with a California utility on transmission pole hardening efforts for high fire risk areas. These continuous efforts consist of projects requiring transmission pole replacements and hardware.

distribution line _edited.jpg

overhead

distribution line

design

We have worked with a client in Florida on designing a 35kV interconnect overhead line. The interconnection was made between a privately invested solar farm and a Florida utility.

elijah-ekdahl-LRhUECQdhec-unsplash.jpg

 transmission

line

engineering

We have worked with a California utility on 42 projects ranging from 69kV to 500kV. These 42 projects required PLS-CADD™ modeling of existing and proposed conditions to include marker ball design, shieldwire replacements, and new pole installation.

anaya-katlego-V8IoC7M3-S4-unsplash.jpg

Transmission

engineering

and

construction

management

We have worked with a Florida utility on rebuilding 2 miles of single circuit 115kV transmission line. The scope of services consisted of quality review of construction packages and design, construction site support, and both operation/coordination for construction sequencing and outages.

jerry-wang-wAZIgHYWBD0-unsplash (edit)_e

transmission engineering

and

construction management

We have worked with a Florida utility on rebuilding 9.7 miles of double circuit 115kV transmission line. The scope of this project consisted of preliminary design, estimating, scheduling, PLS-CADD™ modeling, structure and foundation designing, structure load calculating, material procurement, bid/construction packaging, construction site support, and as-builts.

Improve your reliability today

bottom of page